Add up your indirect business costs, choose a fair allocation method, calculate an overhead recovery rate, then apply that rate consistently to each job.
Example: monthly overheads of £30,000 and 1,000 chargeable labour hours — £30,000 ÷ 1,000 = £30 per labour hour. A job using 40 hours receives: 40 × £30 = £1,200 overhead. That £1,200 must be included when pricing and reviewing the job. Without it, the job appears more profitable than it really is.
Costs clearly traceable to a specific job: labour hours on that job, materials purchased for it, subcontractors used, plant hire, job-specific travel, job-specific expenses and specialist equipment.
Costs that support the business generally rather than one job: admin, rent, software, management time, insurance, utilities, company vehicles used across many jobs, finance and accountancy.
Can this cost be directly and reasonably attributed to one specific job? If yes, it is a direct cost. If it supports the business as a whole, it is overhead — and must be allocated.
Without overhead allocation, jobs can appear profitable even when the business is not. You may think a job made money because it covered labour and materials — but if it did not contribute enough towards rent, admin, vehicles, software, insurance and management, the real profit is far smaller than it looks.
Poor overhead allocation leads to a predictable set of problems: jobs appear more profitable than they are, low-margin work is repeated, quotes are set too low, and good jobs end up subsidising bad ones. Busy teams produce weak profit. Managers lose trust in job reports. Cash flow feels tight despite strong sales. The fix is not accounting perfection — it is a simple, consistent method applied to every job.
Best for labour-heavy businesses. Formula: overhead rate = total overheads ÷ total chargeable labour hours. Example: £24,000 overheads ÷ 800 hours = £30 per hour. A job using 25 hours receives £750 overhead. Always use chargeable hours — paid hours include holidays, sickness and admin, and produce a rate that is too low.
Allocates overhead in proportion to direct labour cost. Formula: overhead rate = total overheads ÷ total direct labour cost. Example: £40,000 overheads ÷ £80,000 labour cost = 50%. A job with £2,000 direct labour receives £1,000 overhead. Useful where higher-paid roles consume more management support and resource.
Applies overhead as a percentage of total direct costs (labour + materials + subcontractors). Formula: overhead rate = total overheads ÷ total direct costs. Example: £50,000 overheads ÷ £250,000 direct costs = 20%. A job with £10,000 direct costs receives £2,000. Watch out if some jobs are materials-heavy and others are labour-heavy — the split can distort results.
For manufacturing, fabrication or equipment-heavy work. Formula: overhead rate = machine overheads ÷ total machine hours. Example: £18,000 machine overheads ÷ 600 hours = £30 per hour. A job using 12 machine hours receives £360. The right choice when expensive plant drives cost more than people do.
Spreads overhead based on each job's share of total revenue. Formula: job overhead = total overheads × job revenue ÷ total revenue. Simple, but often misleading — a small complex job can consume far more admin than a large straightforward one. Best used for rough management overviews only.
Allocates overhead based on how long a job occupies capacity. Formula: overhead per working day = total overheads ÷ available working days. Example: £22,000 overheads ÷ 220 days = £100 per day. A job using 8 team days receives £800. Useful where jobs block out people or equipment even when direct costs are low.
Creates specific cost pools with distinct drivers rather than one broad rate. Examples: purchasing admin allocated by purchase orders raised; project coordination by PM hours; invoicing by invoices raised. Two jobs with identical revenue but one requiring 20 purchase orders to the other's 2 should not carry the same overhead. Start with three or four activities that materially affect margin.
Labour hours — straightforward and reflects the main cost driver.
Labour hours or direct costs, depending on the materials-to-labour mix.
Machine hours, labour hours or production volume.
Chargeable hours or labour cost — links overhead recovery to fee-earning time.
Chargeable hours or project days.
Machine hours or plant usage.
Departmental rates or activity-based costing — one blended rate will distort job costs.
Direct costs or labour hours — start simple and improve as data grows.
A service business with £36,500 monthly overheads and 1,000 chargeable labour hours. Overhead rate = £36.50 per hour.
Without overhead allocation, the cost base would have been £7,000, giving a price of £9,333 at the same margin. That is £2,190 less on one job. Multiply that across a year of work and the impact on business profit is significant.
A manufacturing business with £18,000 monthly machine overheads and 600 machine hours. Rate = £30 per machine hour.
Machine-hour allocation correctly charges more overhead to equipment-intensive jobs — even when those jobs share the same premises and workforce as lighter work. Revenue-based or labour-hour methods would subsidise heavy-machine jobs at the expense of the rest.
Start from your profit and loss report. Identify every indirect cost: rent, admin, management, vehicles, software, insurance, finance, accountancy, marketing, training, depreciation and compliance. Exclude any cost already charged directly to a specific job — if plant hire appears on Job A directly, do not also include it in the overhead pool.
Fixed overheads (rent, insurance, salaried admin) stay the same regardless of how busy you are. Variable overheads (fuel, consumables, transaction fees) move with activity. Semi-variable overheads (vehicles, phones, utilities) have both elements. Understanding the difference helps you decide whether to use a fixed rate, a variable rate or a combination.
Pick the base that most closely drives your overheads. Labour hours for people-heavy work. Machine hours for equipment-heavy work. Direct costs for mixed project businesses. Project days where scheduling capacity is the main constraint. Choose the simplest method that is still commercially fair.
Divide total overheads by the total allocation base. Use budgeted figures for pricing future jobs; use actual figures when reviewing completed ones. Example: £36,000 overheads ÷ 900 chargeable hours = £40 per labour hour.
Multiply job usage by the recovery rate. Example: 32 labour hours × £40 = £1,280 overhead. Add to labour (£1,600), materials (£2,400) and subcontractors (£800): total job cost = £6,080. Without overhead, the cost base is £4,800. That £1,280 difference matters on every job you price.
Overhead should be inside the job price, not listed separately to the customer. Internally: price = direct costs + overhead recovery + contingency + profit. Or: price = total cost ÷ (1 − target margin). A 25% margin on a £9,000 total cost: £9,000 ÷ 0.75 = £12,000.
Each month, compare overhead recovered through jobs against actual overhead incurred. Under-recovery means jobs are not covering costs. Causes include too few chargeable hours, increased costs, too low a rate, or unused capacity. Look for trends over several months rather than reacting to one quiet week.