Estimate the number of hours needed, multiply those hours by the true hourly labour cost for each person or role, then add any job-specific extras such as travel time, supervision, setup, overtime, subcontractor management or an allowance for rework.
Wage cost is what you pay the employee. Labour cost is what it actually costs the business to use that person. Charge-out rate is what you need to charge the customer. Those three numbers are different — and using the wage rate in your estimates means underpricing every job that person works on.
Start with gross pay: hourly wage, salary equivalent, day rate, overtime or shift rate. From 1 April 2026, the National Living Wage for workers aged 21+ is £12.71/hr — check current pay complies and don't use old rates from previous quotes.
For a standard category A employee in 2026/27, employer Class 1 NI is 15% on earnings above the secondary threshold (£96/week). An employee paid £600/week generates ~£75.60 in employer NI on top of their pay before any other costs are added.
Minimum employer contribution is 3% on qualifying earnings. Use actual payroll figures where possible — a flat percentage is useful for estimating but real data is better for accurate job costing.
Most workers are entitled to 5.6 weeks' paid holiday (≈12.07% of working time). Staff are paid for holiday, but those hours aren't available for chargeable work — the cost must be recovered through the jobs they do work on.
Absence reduces available productive hours and can increase cost when cover is needed. For estimating, use an annual allowance based on your own history — don't ignore this, especially for site-based or physically demanding work.
People are not chargeable every hour they are paid. Non-chargeable time includes meetings, training, internal admin, loading and unloading, cleaning vehicles, ordering materials, quoting, toolbox talks and downtime between jobs. If someone is paid for 2,080 hours but only 1,500 are chargeable, the cost per chargeable hour is much higher than the wage rate suggests.
If employees are paid while travelling, that time is labour cost. HMRC approved mileage for 2026/27 is 55p/mile for the first 10,000 business miles. Don't hide travel in overheads if some jobs require far more travel than others — long-distance jobs should carry their own travel cost.
Tools, equipment, uniform, PPE, certifications, licences, medicals and payroll admin all sit around the employee rather than in their wage. For one-off jobs with special certification requirements, treat these as job-specific costs rather than spreading across all work.
A full-time employee whose wage equivalent suggests £16.83/hr actually costs £28.37 per chargeable hour.
Using the £16.83 wage rate instead underprices every single job this person works on. The gap compounds across a year.
18h engineering · 12h assistance · 3h supervision · 2h travel · 1h admin. True labour rates applied.
£1,191 is the labour cost alone — not the selling price. It becomes the base for overhead recovery, contingency and profit.
Once you know your true labour cost, you still need to decide what to charge. The charge-out rate covers true labour cost, overhead recovery and profit. Formula: charge-out rate = true hourly labour cost + overhead recovery + profit.
Example: true hourly cost £28.37 + overhead recovery £12.00 + profit £14.00 = charge-out rate £54.37. Rounded to a sensible customer-facing figure, that becomes £55/hr. Do not confuse the two: labour cost tells you what the work costs you; charge-out rate tells you what you need to charge to make the job worthwhile.
Use: annual employment cost ÷ realistic chargeable hours = hourly rate. Then: hourly rate × job hours = labour cost. Example: £53,000 total cost ÷ 1,450 chargeable hours = £36.55/hr. If that person spends 10 hours on a job: 10 × £36.55 = £365.50. Senior staff often have fewer chargeable hours due to management time — which makes their cost per chargeable hour higher.
Build up from the hourly wage: £18.00 wage + £2.20 employer NI + £0.55 pension + £2.17 holiday + £0.60 sick pay + £0.80 tools/PPE/training + £0.30 payroll admin = true hourly cost of £24.62. If the job needs 30 hours: 30 × £24.62 = £738.60. A flat percentage uplift is better than ignoring on-costs, but actual payroll data is more reliable.
Example: lead installer 10h × £36 = £360 · installer 10h × £28 = £280 · apprentice 10h × £18 = £180. Total: £820. More accurate — use where roles are known.
Add the hourly costs of each team member (£36 + £28 + £18 = £82/team hour), then multiply by team hours: 10h × £82 = £820. Quicker when the same team regularly works together.
Construction jobs need time for loading the van, collecting materials, travel, site induction, setting up, waiting for access, co-ordinating other trades, cleaning down, snagging, waste removal, handover, return visits and warranty work. If these are not included, labour is underpriced before work even starts.
Construction labour cost = site hours + travel + setup + supervision + snagging + admin + rework allowance. Track labour by job phase — preparation, first fix, second fix, testing, snagging and handover — and future estimating becomes much more accurate.
Labour cost per unit = total labour cost for production run ÷ number of usable units produced. If 330 units were started and only 300 were usable, divide by the usable output. Include setup time, changeover time, inspection and rework — these are often missed when calculating unit labour cost.
Include: subcontractor quote + management time + quality checks + admin + insurance/compliance checks + risk allowance + your margin. Example: subcontractor charge £1,000 + 3h management × £45 = £135 + admin £40 + risk £75 = true cost of £1,250. Subcontractor work still uses your time, systems and reputation — price it accordingly.
Straight answers, no jargon.
We'll show you planned-versus-actual labour on your own jobs — and where the estimates need adjusting.