How to review a completed job

A completed job review compares what you expected with what actually happened — did the job make the planned profit, where did costs move, and what should change before the next quote?

Many businesses finish a job, invoice it and move on. That's understandable, but it skips one of the most valuable parts of job costing: learning.

In short
Compare estimate vs actual
Find the cause, not just the gap
Turn findings into actions
Make it repeatable
The method

The review, step by step

Start with the original estimate

The commercial baseline — and the assumptions behind it.

Compare estimate vs actual by category

A total variance isn't enough; break it down.

Review labour variance

Usually the biggest reason margin moves.

Review supplier & material cost

Against the original allowance and pricing.

Review variations & scope change

Were they approved, charged, or quietly absorbed?

Calculate final margin

Then compare it with the target.

The key question

Distinguish the cause of the variance

A job can miss margin for very different reasons: it was underquoted, it was poorly controlled, it changed legitimately, or it suffered supplier increases. Each needs a different response.

Don't skip the assumptions. A quote may have assumed easy access, stable prices, limited feedback or no return visits. If those changed, that's the story behind the numbers.

Turn it into action

What a good review produces

✓
Update labour allowances
For job types that consistently overrun.
✓
Add travel or admin to quotes
Time that keeps getting missed.
✓
Refresh material pricing
Where supplier costs have moved.
✓
Add contingency
For work types that carry more risk.
✓
Tighten variation control
So change gets charged next time.
✓
Reprice or drop weak work
When a job type never pays.
Make it stick

Short enough to happen, useful enough to matter

For each meaningful job, capture expected vs actual revenue, cost and margin, the main variances, the cause, the lessons and one action for future quotes.

Do it on live job data rather than reconstructing the truth months later from spreadsheets, emails and invoices.

FAQs

Questions, answered

Straight answers, no jargon.

The original estimate against actuals — revenue, each cost category, variations and final margin versus target.
To learn what to repeat. Good reviews explain strong performance, not just failures.
Labour overrun and untracked variations — extra hours and uncharged change that weren't visible during delivery.
On every meaningful job. Keep it short and structured so it actually happens.
It reviews jobs on the same live cost structure used during delivery — budget, actual, committed, variations and margin — so nothing is reconstructed after the fact.
Explore more

Related pages

Learn from every completed job.

Contact us and we'll show how completed-job reviews turn cost data into better margins.

Contact usSee profitability reporting