Bill of quantities (BOQ)

A bill of quantities — also written as BQ or BOQ — is a document used in UK construction and civil engineering that itemises every work section, material and quantity required for a project. It is prepared by a quantity surveyor and issued to contractors as the basis for tendering.

Because all bidders price from the same document, a BOQ makes tenders directly comparable. It also provides the reference point for measuring variations, valuations and final account.

In a sentence
A structured tender document
Prepared by a QS
Common reference for all bidders
BOQ vs BOM

Two documents, different purposes

A bill of quantities is used in construction procurement — it describes the scope of work so contractors can submit comparable prices. A bill of materials (BOM) is used in manufacturing and production — it lists the components required to build a specific product.

In practice, a construction project may use both: a BOQ to tender the overall contract, and BOMs for specific fabricated elements within it.

BOQ and job costing

Where the BOQ connects to cost control

The BOQ becomes the estimate in the job costing system — the agreed budget for each section of work. As costs are recorded against each section, the comparison between BOQ rates and actual cost is where performance and variation are measured.

FAQs

Questions, answered

Straight answers, no jargon.

A quantity surveyor, either in-house or appointed by the client. The BOQ is typically issued as part of the tender pack so all contractors price from identical documents.
No, but it's standard practice on public sector contracts, larger private contracts and most traditional procurement routes. Design-and-build contracts often use an employer's requirements document instead.
The BOQ becomes the job budget when the contract is awarded — each section is a cost target. As work progresses and costs are recorded against each section, variance against BOQ rates shows where the job is performing and where it needs attention.