A contractor might use 1000 Labour, 2000 Materials, 3000 Plant, 4000 Subcontractors, 5000 Variations, 6000 Preliminaries. An engineering firm might code design, procurement, fabrication, testing, installation and commissioning.
If a job is £15,000 over, cost codes show whether it was labour, materials, subcontractors or rework.
Cost codes are operational — they help manage job cost. Nominal codes are accounting codes for classifying income and spend in the accounts. They can connect, but they aren't always identical.
Straight answers, no jargon.
Contact us and we'll show how the platform tracks this across live work.