Estimated cost

Estimated cost is what a business expects a job to cost before or at the start of delivery — usually set during quoting, estimating or project approval.

It becomes the baseline for budget-versus-actual reporting once the job is won.

In a sentence
The expected cost
Set at quote stage
Becomes the budget baseline
Example

From estimate to expected margin

A job is quoted with £10,000 labour, £8,000 materials, £5,000 subcontractors, £1,000 expenses and £2,000 overhead — £26,000 estimated cost.

At a £40,000 selling price, the expected profit is £14,000 and the expected margin 35%.

Why it matters

A weak estimate weakens the quote

If the estimate is wrong, the quote is wrong from the start — a job can look profitable at sale and still lack the margin to survive normal delivery. Good estimates need cost history, so completed jobs should feed back into future pricing.

FAQs

Questions, answered

Straight answers, no jargon.

The original estimate captures the plan at quote stage. Some businesses create a revised budget after contract award to reflect final scope. The estimate shouldn't be changed just because a job is running over — that removes the reference point for understanding what went wrong.
A quote is the commercial price presented to the client. Estimated cost is the expected cost of delivery — usually lower, with the gap representing intended margin. They're related but serve different purposes.
Usually the estimator or project manager at the start of a job. Getting the estimate structured by cost category — labour, materials, subcontractors, overhead — makes comparison with actual cost far more useful than a single total.